
- 300 W LED beam, 70,000 lm
- 6000K, CRI 70, dimmable
- DMX512 control, IP33
- 11.8 kg, pole-mount ready
What to confirm before your first factory order: samples, specifications, certification, lead time and after-sales support.
Order a sample of each shortlisted model before committing to volume. A single unit reveals build quality, color consistency and packing condition in a way a spec sheet cannot.
GOGFITS accepts sample orders from 1 piece on current models, so the sampling step costs one fixture, not a pallet.
Copy the specification table from each product page into your own purchase order document; both sides should sign off on the same text.
For EU and US buyers, CE and RoHS are the baseline documents to request from the factory. Laser products carry additional safety classification requirements — confirm them before quoting your own customers.
Ask which documents ship with the goods and which are available on request; a factory that answers this instantly is a factory that ships to your market regularly.
Standard lead time on current models is 15–30 days depending on model and quantity; every unit should pass an aging test before packing — ask for the QC record.
Agree trade terms (EXW, FOB or CIF), payment schedule and warranty in the same written quotation. One year of warranty with spare-parts support should be the floor for professional fixtures.



Send the room size, fixture list or a reference photo — we confirm models, quantities and lead times.